Oct 2014

PLEASE NOTE THE MEETING  FOR OCTOBER 2014 WAS CANCELLED AND DID NOT TAKE PLACE

The following are the notes that would have been use for the October meeting if it had not been cancelled  

 

APOLOGIES –  n/a

 

1 MINUTES OF LAST MEETING – n/a

 

2 FINANCES/GRANTS –   Statements now going to correct address / person

 

3 RIVER CLEANING – Machine weed clearing was carried out on 19th September from Court Lane to behind Castlewood, also clearing was also carried out from the field on the north side of the river and about 20 meters of weed and silt was removed that had previously been missed when clearing took place at the end of June. This has had a significant effect on the river level which has resulted in the water being retained in the Land Yeo and not entering the Yearling ditch and the flowing over Cooks Clyse.  At the end of September the  contractors returned to start the manual weed clearing between the motorway and Court Lane,  working down past the Medical Centre.  Machines will soon be used again to clear from Strode Road to the outfall.  No LYF work parties have been organised as we had been informed that more weed spraying would be taking place.

 

4 EQUIPMENT – Stronger grapnel hook now finished

 

5 FOOTPATHS/WALKS – Nothing heard back  re permissive footpath.

 

6 LEVELS & FLOW – See river heading

 

7 REPORT OF RIVER SECTIONS

 

Bernard’s section –  No news re clearing the settling pit for water run off from motorway

 

Stewart’s section – Whilst pulling a sample of weed with a hooked bamboo cane  I was surprised to see a Kingfisher fly under the cane right in front of me, never seen one before at such close quarters.  Water clearing after weed cutting and fish stocks very healthy.

 

Town section – A request to clear the trash screen has been made, a large build up has recently occurred following the weed cutting. Bush will be removed if not cleared by contractors.

 

Trevor’s section – EA opperatives visited riparian owners in order to spray weed in the river, remainder should be cleared manually by contractors soon.

 

Franks section – Weed clearing should be carried out soon from Strode Road to Outfall.

 

8 PUBLICITY- n/a

 

9 WEBSITE-  n/a

 

10  ANY OTHER BUSINESS –

Meetings will take place on the following dates :-

2014 – 2 Oct / 4  Dec

2015 –  5 Feb  / 2 Apr / 4 June / 6 Aug

AGM – 3  Sept 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s